Turnkey Projects

TRANSPORTATION DEVICE FOR SPRAYERS

Developed to move sprayers without their own mobility to the end of production line, it has a lifting capacity up to 6 tons.

The device operation is based on 24V batteries. It has tilting axles that gives to independent steering the ability to work with minimum turning radii.

It has a remote control lifting system and is adaptable to 10 sprayer models. Work autonomy extends up to one week.

YEAR

2023

PROJECT DURATION

140 days

CLIENT

PLA

AUXILIARY LIFT EQUIPMENT

Developed for vertical movement of harvesters on assembly line.

Each device has their corresponding certifications and calculation reports to ensure reliability and traceability of parts.

YEAR

2022

PROJECT DURATION

40 days

CLIENT

JOHN DEERE

LIFTING EQUIPMENT

Specially designed and manufactured to meet customer needs for a safety and efficient handling of loads.

Each device has their corresponding certifications and calculation reports to ensure reliability and traceability of parts.

YEAR

2023

PROJECT DURATION

90 days

CLIENT

PLA

SERIAL RIVETING DEVICE

Developed for serial riveting of components that make up header skid of different combine harvester models.

YEAR

2022

PROJECT DURATION

60 days

CLIENT

MAXION MONTICH